Skip to content
CCN Cargo Charter Network

Freighter capacity for forwarders and shippers

Air freight charter when scheduled capacity runs out

Estimated price in 10 seconds →

Submit a requirement any time — no account needed · first response usually within 60 minutes · 24/7 for AOG and time-critical. Optional: business account for status tracking

Scheduled air freight works until it does not: space is sold out, the cut-off has passed or a piece exceeds what the belly or a scheduled freighter accepts. Then the question is what to switch to — a full charter, a part charter or a consolidation on someone else's flight. CCN compares those options for shippers and forwarders.

Freighter loaded from a cargo terminal apron

Full-charter capacity

When scheduled belly space runs out, a whole aircraft moves the shipment.

CCN is an independent broker and operates no aircraft. Each mission is placed with a regulated operator after comparing several options. How independent brokerage works.

Night shift pallet build-up in an air cargo terminal

What CCN handles when a shipment falls off scheduled service

  • Checking why the booking failed: space, cut-off, piece size or commodity
  • Comparing full charter, part charter and consolidation for the same shipment
  • Looking for part-charter space on flights already planned on your lane
  • Aligning the charter with existing bookings, AWBs and customs status
  • Coordinating trucking to an alternative departure airport if that is faster
  • Keeping the forwarder or shipper as the single point of contact

If the whole aircraft is needed, the details are on cargo charter.

Forwarders who want to keep their customer relationship should read charter for freight forwarders.

Seasonal shortages are covered under capacity and peaks.

When to switch from scheduled air freight — and when not

A good fit when

  • — Scheduled space is sold out for several days on the lane
  • — Pieces exceed the belly or the scheduled freighter's door or contour
  • — Several shippers' cargo for the same lane can be combined on one aircraft

Usually not the right choice when

  • — The next scheduled flight with space is acceptable for the delivery date
  • — The volume is small and a part charter cannot be found — the per-kg cost then rises sharply
  • — The deadline is weeks away — sea-air or road can cover it

If a production line is waiting, see time-critical air freight.

For price drivers and quote structure see cargo charter cost.

Capacity structures

Four ways to buy the capacity

The same requirement can be bought as a whole aircraft, as a share of one, as reserved space on a running rotation or as leased capacity with crew. The structure decides the price far more than the aircraft type does.

Full charter

One shipment fills a deck, or timing and commodity rule out sharing

You control the schedule, the loading plan and the routing.

Part charter

Volume fills part of a deck and the ready date tolerates consolidation

Cost is shared across shippers inside one build-up window.

Blocked space

Recurring volume on a lane that already has a rotation

A fixed allocation per flight, committed for a defined period.

ACMI / wet lease

Capacity is needed for weeks or months, not for one flight

Aircraft, crew, maintenance and insurance leased against guaranteed block hours.

What the desk needs to compare charter options

Full checklist: what a firm cargo charter quote needs.

  1. 01Lane and the booking that failed (carrier, date, reason if known)
  2. 02Ready date and the date the cargo must arrive
  3. 03Chargeable weight, pieces and dimensions per piece
  4. 04Commodity and any special handling
  5. 05Whether the cargo can be split across flights
  6. 06Whether the cargo may share the aircraft with other shippers

Typical freighters for an air freight charter (indicative)

Narrow-body freighters suit pallets that missed a regional connection; wide-bodies replace a full scheduled allocation.

  • Boeing 737-800BCFPayload: 21,450 kgMain deck door: 3.40 m × 2.16 m (side)
  • Boeing 757-200FPayload: ≈ 39,000 kgMain deck door: 3.40 m × 2.18 m (side)
  • Boeing 767-300FPayload: 53,977–54,884 kg (by engine)Main deck door: 3.40 m × 2.54 m (side)
  • Boeing 777FPayload: ≈ 102,000 kgMain deck door: 3.72 m × 3.05 m (side)

Indicative — depends on route, fuel, density and operator. CCN operates no aircraft; types shown are examples operators offer, not a fleet.

Limits to check before switching to a charter

  • Whether the cargo is already tendered or screened for another carrier
  • Customs status and documents that must be re-issued
  • Minimum volume that makes a part charter viable on the lane
  • Handling capacity for an ad-hoc freighter at the airport

From failed booking to charter flight

  1. 01You send the shipment data and the reason scheduled service failed.
  2. 02The desk compares full charter, part charter and consolidation options.
  3. 03You choose; the desk confirms the aircraft and re-routes documents with you.
  4. 04Handling and trucking are aligned and the flight is watched until arrival.

What an air freight charter offer contains

  • Aircraft type, operator and registration where already allocated
  • Routing, technical stops and planned timings (local times)
  • Usable payload and volume for your cargo on this routing
  • Price basis (per flight, per block hour or per rotation), currency and validity
  • Inclusions and exclusions — handling, fuel, permits, insurance, positioning
  • Subject-to conditions: availability at signature, permits, slots, operator acceptance
  • For part charter: your share of the aircraft and how the price is split
CCN cargo units and tug beside a freighter

Questions

Frequently asked questions

See all questions

In practice they describe the same service. Air freight charter is the term forwarders and shippers use; cargo charter is the term used more often by operators and brokers.

Scheduled space gone? Send the shipment details.